Sample output

Sample: Electrical addendum checklist


Static sample only. It shows the shape of the memo, not a real bid review.

ProjectFairview Service Center Renovation
TradeElectrical
AddendumNo. 03
Bid riskHigh
Trade impactMedium
Sources5 source snippets across pages 1-4

Required before bid

  1. Acknowledge Addendum No. 03 on the bid form.
  2. Use the revised Notice to Bidders.
  3. Confirm bid due date from the revised notice.
  4. Review lighting fixture and lighting control scope before final estimate.

Changes to review

TypeItemDetailSource
AcknowledgmentAddendum acknowledgment requiredAddendum No. 03 and its issue date must be noted on the bid form.Page 1
Spec / Bid documentNotice to Bidders replacedSpecification Section 00 11 16 is replaced with the version attached to the addendum.Page 1
Trade impactLighting scope includedExisting light fixtures and lighting controls are included in project scope.Pages 2-3

Source snippets

PageSnippetNote
Page 1
Addendum No. 03 forms part of the contract documents and shall be acknowledged on the bid form.
Bid form acknowledgment item.
Page 1
Delete Specification Section 00 11 16 Notice to Bidders and replace with the attached revised section.
Replaced bidding document.
Page 2
Existing lighting fixtures shown in Room 1400A shall be removed and replaced as indicated on revised sheet E-201.
Electrical scope confirmation.
Page 3
Lighting controls shall be coordinated with occupancy sensors and low-voltage control wiring shown in detail 3/E-501.
Controls coordination risk.
Page 4
Questions received through the cutoff date are answered below; no substitutions are approved by this addendum.
Estimator should check fixture assumptions.